The Castel San Giovanni hub is an innovative and revolutionary project begun in 2004, which represents one of the most important challenges for Engineering2k. Today, the center in the province of Piacenza is considered the largest in Italy, among the largest in Europe, covering an area of approximately 1,900,000 m2 of which approximately 960,000 m2 of gross floor area.
In just a few years, the Piacenza hub has become one of the most attractive sites for companies, thanks to its strategic position, located between the A21 and A1 motorways. In fact, many large brands have chosen it as a reference point to develop their business, including the four largest global logistics services providers in Europe.
The Castel San Giovanni logistics hub not only represents one of the largest European logistics areas, but also stands out for its high standard of safety and reliability, its commitment to eco-responsibility and the well-being of the users who occupy the properties. Since its early years, Engineering2K has integrated sustainable practices into every phase of the hub’s design and construction, including the installation of multiple photovoltaic systems throughout the operations center.