Follow Us
Document Download
MULTITEMPERATURE LOGISTICS WAREHOUSE

Longiano (FC)

The main characteristic of the building is the +2°/+4° controlled-temperature area for the storage of foodstuffs.


The construction placed particular focus on sustainability; the building is fitted with LED lighting units and an 18 KWp photovoltaic system. The building has been built with a view to the future implementation of BMS, allowing the proper management of utility consumption.

WORKS COMMENCED: 1 NOVEMBER 2021

WORKS COMPLETED: 19 APRIL 2022

SPECIFICS: 19 LOADING BAYS

M2 TOTAL SURFACE AREA
0
 

Gallery

STEF