LOGISTICS WAREHOUSE

Casei Gerola Logistics Park 2

In completion of the Casei Gerola Logistics Park, a second building was constructed, complete with an NFPA-regulation sprinkler system and a fire-prevention system with UNI hydrants, LED lighting, BMS and internal truck charging points.


Materials with a high reflectance index (SRI) were used in the construction of the building to reduce the heat-island effect. Planning was carried out with BIM technology and the building obtained LEED PLATINUM certification.

WORKS COMMENCED: 14 FEBRUARY 2022

WORKS COMPLETED: 28 MARCH 2023

TOTAL SURFACE AREA: 21.843 m2